Crenshaw Fire Station #94


crenshawfirestation001
crenshawfirestation002
crenshawfirestation003
crenshawfirestation004
crenshawfirestation005
crenshawfirestation006
crenshawfirestation007
crenshawfirestation008
crenshawfirestation009
previous arrow
next arrow
crenshawfirestation001
crenshawfirestation002
crenshawfirestation003
crenshawfirestation004
crenshawfirestation005
crenshawfirestation006
crenshawfirestation007
crenshawfirestation008
crenshawfirestation009
previous arrow
next arrow

OWNER: City of Los Angeles
LOCATION: Los Angeles, CA
DELIVERY METHOD: Design-Bid-Build
SQ. FT.: 30,518
LEED™ Certified

Crenshaw Fire Station #94 was built under Proposition F, the Fire Bond program for the City of Los Angeles. This project was built in 3 phases and consists of a new 28,188 sq. ft., 2-story structural masonry building with brick veneer, and a detached 2,330 sq. ft. community center.

Traffic control was an important part of Phase 2 because of the extensive street improvements and traffic signals in the public right-of-way. Some of the specialized features of construction are Herculite entrances, tele-sliding and roll-up doors, metal wall panels, and stained and epoxy flooring. Important amenities for the firefighting team include dorms, showers, response bays, offices, conference rooms, a kitchen, and a handball court.